Product Introduction

The Shenzhen foundation-pit air dome entry concerns the use of a membrane enclosure over a construction work area. In an urban site, access and the relationship to surrounding operations are important alongside the cover itself. The project brief should define excavation stages, equipment clearance and the environmental-management measures required for the location.

Product Features

  • Construction access: coordinate the enclosure with excavation, lifting operations, logistics and personnel routes.
  • Work-area protection: assess rain exposure, dust and noise-control needs as part of the site plan.
  • Phased use: consider installation sequence, site interfaces and any relocation requirements in the project design.