The Beijing Bahe renovation entry focuses on an air-rib membrane enclosure for foundation-pit work. A construction cover in an urban renovation setting must be considered alongside excavation access and the surrounding work area. The design brief should address site logistics, weather exposure and the relationship between the enclosure and each stage of construction.
Product Features
- Construction access: coordinate the enclosure with excavation, lifting operations, logistics and personnel routes.
- Work-area protection: assess rain exposure, dust and noise-control needs as part of the site plan.
- Phased use: consider installation sequence, site interfaces and any relocation requirements in the project design.