Product Introduction
The CR Power Wenzhou power-plant entry concerns an air dome coal warehouse. The application brings a material enclosure into a plant environment where storage, loading and fuel handling need to work together. The project brief should coordinate the coal-handling process, transport and conveyor interfaces, and the environmental measures required for the site.
Product Features
- Working-space coordination: arrange storage zones, handling equipment and vehicle routes within the enclosure.
- Environmental planning: select weather protection, ventilation and dust-management measures for the stored material.
- Operating integration: coordinate openings, conveyors and maintenance access with the surrounding industrial site.

.jpg)



