Product Introduction

The Guangdong Yangjiang foundation-pit air dome entry concerns membrane enclosure use at a construction excavation. The cover and the work beneath it need to be planned as one coordinated site arrangement. Equipment access, excavation stages, drainage interfaces and weather exposure are relevant design considerations for this type of application.

Product Features

  • Construction access: coordinate the enclosure with excavation, lifting operations, logistics and personnel routes.
  • Work-area protection: assess rain exposure, dust and noise-control needs as part of the site plan.
  • Phased use: consider installation sequence, site interfaces and any relocation requirements in the project design.