Product Introduction
The Xi’an ancient-tomb excavation entry concerns an air-rib membrane cover supporting an archaeological work area. This use requires coordination between building enclosure, excavation access and the conservation needs of the site. The project brief should be developed with the archaeological team so that equipment, circulation and environmental requirements follow the work being protected.
Product Features
- Excavation-space planning: coordinate the enclosure with working areas, equipment and access to the excavation.
- Weather separation: assess how the membrane cover and drainage interfaces can support site protection.
- Conservation coordination: confirm environmental and access requirements with the archaeological and conservation teams.





